New red roof tiles around a dormer window

Gungahlin New Build

Concrete tile installation

New BuildGungahlin, ACT
Property
Two-storey new home
Roof system
Flat-profile concrete tile, hipped and gabled
Size
280 m²
Timeline
5 days
Completed
August 2025

The project

This two-storey home in Gungahlin, in Canberra’s growing north, was built for a young family who wanted a clean, modern tiled roof. The builder engaged us to supply and install the full roof system, along with gutters and downpipes, once the frame and trusses were signed off.

Working to the build programme

New builds run to tight schedules. Plasterers, electricians and window installers all need the house closed in before they can start inside. We met the builder on site to agree timing, scaffold requirements and where materials would be dropped on what was still a muddy block.

Our first priority was to get reflective sarking across the trusses. That made the frame much more weather-resistant within the first day, even before a single tile went on.

Installing the tiles

The owners chose a flat-profile concrete tile in a charcoal colour. Flat tiles show any unevenness in the battens, so we spent time setting out batten spacing and alignment across each roof plane. Key steps included:

  • fixing tiles to suit the wind classification for the site
  • forming the valleys with Colorbond valley irons
  • detailing the junction where the gable meets the main hip
  • bedding and flexibly pointing ridges and hips once the field tiles were down.

Gutters and downpipes

Because we were already on site with scaffold up, we installed square-line Colorbond gutters and downpipes in the same visit. Outlet positions were set to suit the stormwater plan and the larger roof sections draining to the rear of the house.

Handover

The roof was finished within the builder’s programme, and the internal trades started on time. We provided the builder with installation photos and warranty documentation for the homeowners’ records.

The challenge

The builder needed the roof installed within a tight window so plasterers could start on schedule. The two-storey design included several valleys and a gable junction that needed careful detailing.

Our solution

We coordinated deliveries and scaffold with the builder and installed sarking first to make the house weathertight early. Tiles were laid in sequence with valleys and junctions detailed before ridges were bedded and pointed.

Services on This Project

Full Re-Roofing

Complete tear-off and replacement for roofs past the point of repair.

Gutters & Downpipes

New gutters, downpipes and guards sized to handle Canberra's summer downpours.

Planning a Similar Roof Project?

Tell us what's going on with your roof and we'll arrange a visit at a time that suits you. Emergency make-safe is available around the clock.